[Green-Trust Off Grid] Axial Flux Wind Turbine Raising
September 30th, the pads for the new wind tower are being poured. November 14th, the tower and turbine goes up and the power will be connected to the batteries. Jim Juczak from Woodhenge will be officiating over the technical aspects of the ceremony. Come and join the fun, and learn how to build and raise your own wind turbine from common home and workshop items. email for more info.
--
Posted by Steve Spence to Green-Trust Off Grid at 9/17/2006 08:44:00 AM
--
Posted by Steve Spence to Green-Trust Off Grid at 9/17/2006 08:44:00 AM